With the cost going up day by
day, we( me and my wife) decided to build a house in our native place Gurpura kaikamba. I never had any knowledge about the house
construction process, but there were lot of decisions i needed to take for the progress of the house.
I have bulleted the process of my house construction and various thoughts
towards my decisions on designs and selection of materials.
I hope the process and factors i
have mentioned below will be helpful to you in the event you come up with
building a house.
1. NECESSITY TO BUILD A HOUSE:
Since there was already a plan to build house, i thought better make it sooner
than later. Please make a decision based on your requirements.
2.PLAN: This is the most
important step of decision making. I am sure everybody will have some idea how
own house should appear. I made a draft plan and discussed with a civil engineer consultant and fine tuned it to my requirements.
I have a tip here inform. Listen
to everybody’s ideas. See some houses for more ideas.But decide what you would
like to have
1. Levelling: make
the plot flat and clean. Since there
were trees before the house, i have ensured that there are no roots on the area
where the house will be constructed.
2.Marking: This is the most important step. Marking will be
done as per the blue print.
3.Foundation work base work: The foundation will be made by
digging the marking. Below picture will give an idea.
The depth depends on the height of the building. For a
normal 2 floor building the depth should
be 3 ft. I had rock at 1.5 ft and after it was chipped using compressor.
3.Foundation stone construction: The stones will be built sideways as per below picture.
4.Filling the mud: The height of the foundation was around
3ft above the ground. The mud was filled as shown in photo. We had to ensure
about the mud without any plastic, roots and other foreign materials.
I did this work in July during masons and hence there was no
need for me to put water. I allowed the foundation to settle for 20 days.
5.Construction up to Lintals: Now the stones will be build along
the length of the line. If you look close on the below photo, you will
understand.
6.Lintel work: Lintel work will start after reaching 7ft height.
Wooden planks will be prepared for concreting the windows side ways protector,
sit out, work area, stair case.
7. Reinforcement rods for concrete: Beams will be made out
of concrete. Size if the rods will be higher (16mm ) for beams and less around
8mm for the other area.The rods intersections
were tiled with the wire for uniformity
and tightness.
8. Lintels concrete filling: This was the photo of the stair
case once the concrete mixture was put in.
We waited for one week before taking up the construction.
9.Built up to the terrace: The stones construction will go
further up by 3 ft making it total 10 ft from the ground. I do not have
pictures to show this.
10. Terace concrete preparation: This is another important
milestone. Below pictures will speak better about this.
11. Terace:The concrete
mix was made and terrace was built.below photo just after the terrace. The entire work of the concretisation has to happen on the same day. The terrace concrete work was completed around 1 PM and immediately plastering was done on the terrace.We kept the terrace with water for one month for curing.
12.Stair case room construction: Since i had decided to have the staircase inside, it
costed me additional 1.5 lakhs in 2011. The stair case room was constructed.
12. Electrical work and plumbing work: Before the
plastering, the chipping work for the electrical work started.The electrical
chipping work can start after 20 days from the
concrete day at the terrace.
I had to make a lot of thinking to keep the electrical
appliances and make arrangement for the electrical points. I decided the location of the refrigerator,washing
machine,oven, electrical cooker, fans and lights, switch board near to the bed,
the light positions outside and upstairs.
I also decided the toilets and bathrooms, the position of
commode,shower, washing basins and so on.
13. Plastering: Soon after the chipping work, the plastering
started. In order to save time and speed up theprogress of construction, the
electrical contractor finished the chipping room by room so that the plastering
can be started paralely.
Plastering of the entire house took about 40 days. This
could have been reduced to 30 days, but there was a delay in work from masons.
13 a: An important matter is to fit all the windows before the plastering.Masons
will complete one wall on the same day.Another point is that plastering will
commence from sealing and then on the walls.If you see the below photo, we can
identify that the windows have been fit
at the time of plastering.Also we have to fit the wooden shutter for the door.
14. Flooring: I decided to put granites in the living room hall and stair case steps
and bedrooms and the kitchen area will have the tiles. Selection of tiles was
based on the color combination keeping in mind
of the color of the house, cost and the quality. I took one day off from
the office for tiles and granite selections.
At this point of time, we had the temporary electrical power
connection given to the house in order to carry out the tiling and graniting
work.
15. Once coat of paint: One coat of white coat was painted
in the mean time.
16. Electrical work: Complete wiring for the house was done
after one round of coating was completed. Plumbing work was 90% completed. You
can see the water connection pipes in the below picture.
17.Painting: I had chosen
redwine white color in side and creamish white outside.There were 7
people for painting and the painting work for the entire house including the
doors and windows was over within one week.
18.Finshing work:This includes
·
Fitting of electrical lights and switch boards
·
Bathroom fittings
·
Show case readiness
·
Furnishing
according to your intentions.